by Jennifer Tankleff | Jan 10, 2019
Installation of a 24′ ViaLift equipped with a 16 circuit raceway and a 30′ pipe batten. The students and staff at North Shore H.S. used to have a difficult time adjusting and maintaining their front of house lights as access to the ceiling was very limited...
by Jennifer Tankleff | Jan 10, 2019
We installed a new Main Curtain and Main Valance along with a new stage masking package for the Sunnyside Intermediate School, in Lafayette, IN. The fabric for the Main Curtain and Main Valance was Crimson 22oz Encore and...
by Jennifer Tankleff | Jan 10, 2019
IWEISS recently completed a renovation at Marist College in the Music Building and Student Center Renovations. The Nelly Goletti Theatre received all new Drapery, including a New House Curtain and Valance with a Full Stage Set of IFR Velour...
by Jennifer Tankleff | Jan 10, 2019
Berkeley Carroll, a college preparatory day school located in Brooklyn, recently expanded their campus to include a 396 seat performing arts center. An 80 year old church was renovated to create a space that can be re-arranged for a variety of purposes....
by Jennifer Tankleff | Jan 10, 2019
Multipurpose room used for theatrical performances, dance, and TV studio work. IWEISS intalled a pipe grid, stage curtains and rigging, and masking to cover mirror walls.