by Jennifer Tankleff | Jan 11, 2019
IWEISS was contracted by Coloredge Visual to furnish and install a motorized PileHoistsystem to operate a pipe batten with a 30’ tall banner in the storefront window of the new Footlocker on 34th street in New York City. The motorized system will allow Footlocker to...
by Jennifer Tankleff | Jan 11, 2019
IWEISS engineers were challenged to hang the 44′ long skeleton of one of the last Right Whales at the Museum of the Earth in Ithaca, NY. It had to be rigged from the structural steel of the building before the 4th wall of the exhibit space was in place, since...
by Jennifer Tankleff | Jan 11, 2019
Back in 2013, The National Museum of the Marine Corps contracted Century Aviation of Wenatchee, WA to restore an F-18 Hornet that was stationed at Andrews Air Force Base. This happened to be the first Marine Corps plane in the air...
by Jennifer Tankleff | Jan 11, 2019
Oh HELLO Have you ever seen a puppet curtain? Now you have. Puppet Design: Basil...